WEEK 7

TITLE: Repair drainage and mulching.

INTRODUCTION:

-In this week 7 we don't have much work to do, except that we only repair some water drainage that doesn't work well. next, we look for weeds to make mulch above the planting bed.


OBJECTIVE:

 1.Avoid stagnant and overflowing water.

 2.Avoid plants exposed to direct sunlight  


ACTIVITY

1. 7:00am-Morning exercise

 2. 7:20am-Take tools

 3. 7:30am-Go to farm

 4. 7:40am-Start to do task given by lecturer

 5. 11:00am-End fieldwork


CHALLENGE:

1.Erratic weather.

2.Hard ground.

3.Limited fronds and weeds.


TOOLS:

1.Machete

2.Hoe


PHOTO: